EV charging that's built to keep working

We are pioneers in EV charging infrastructure. We design, build and install charging for hosts, fleets and networks, then operate and maintain it. Where the grid connection is the constraint, we add battery storage, so fast chargers can run without an oversized connection.

Fig.: A charging site with a battery buffer and solar canopy. Schematic, not to scale.

Build · install · run · maintain

From site survey to session data

Six ways we work on charging, from a first drawing to chargers already in service, whoever installed them.

Design & build (EPC)

Site survey, load and tariff study, electrical design, civil works, charger supply from vetted makers, installation, commissioning and onboarding to your charging software.

Survey, Design, Build, Commission

  • Distribution company (DISCOM) and Electrical Inspectorate paperwork
  • Protection, earthing and surge design
  • Signage, lighting and parking layout

Installation for networks & makers

Already chosen a charger or a charging network? We install, test and commission to the maker's requirements and the Central Electricity Authority's (CEA) safety regulations for charging stations.

Prepare, Install, Test, Hand over

  • Foundations, cabling and terminations
  • RCD, earth-continuity and functional tests
  • Photo record and as-built drawings

Operate & maintain

Remote monitoring over the Open Charge Point Protocol (OCPP), preventive maintenance, repairs and spares, and the records the CEA requires owners to keep. If you'd rather not run the station yourself, we can operate it for you on the charging platform you choose.

Monitor, Inspect, Fix, Report

  • Fault alerts and remote resets
  • Connector and cable replacement
  • Monthly availability and session reports

Storage-backed fast charging

A battery, charged steadily from a smaller connection or from solar, delivers the bursts fast chargers need.

Size, Buffer, Charge, Manage

  • Avoid or defer transformer upgrades
  • Limit demand peaks
  • Keep charging through short outages

Fleet & depot charging

AC or DC for e-3W, cabs, delivery vans and buses, scheduled around your shifts and the tariff. Under Tamil Nadu’s EV tariff (TNERC T.O. 6/2025; revision pending as of September 2026) the cheapest slot is 9 am–4 pm; charging within existing HT premises may instead be billed at the premises’ own tariff.

Duty cycle, Charger mix, Schedule, Maintain

  • Charging schedules built on your tariff category
  • Depot power design and HT works
  • Battery buffering for peak-hour top-ups

Charger audits, repair & upgrades

For chargers already in the ground: a health check, repairs, and a plan for older units, such as Bharat AC-001/DC-001 chargers, early sites without OCPP, or car-only sites that need light-EV points.

Inspect, Repair, Upgrade, Maintain

  • Connector, cable and power-module replacement
  • OCPP onboarding or migration
  • Adding LECCS points for 2W and 3W

Hosts & fleets

Chargers where vehicles stop

Illustrative; no sites are implied. Schematic, not to scale.

Hotels, resorts & highway stops

Travellers on the NH44 and NH66 corridors, both of which end at Kanyakumari. DC fast charging for people passing through, and AC for overnight guests.

Tourist, pilgrim & public sites

Car parks where visitors stay for an hour or more: AC and light-EV points sized for dwell time, with load management so a busy weekend doesn’t trip the supply.

Hospitals & campuses

Staff, visitors and fleet vehicles, charged within your existing premises, with separate EV metering where it pays.

Apartments & builders

Tamil Nadu's building rules (amendment reported November 2025) require a charging point for every required parking space in new residential buildings above a size threshold, and fast charging for at least 10% of parking in commercial, industrial and institutional buildings above 300 m² of FSI area. We design load-managed systems, so a charger per bay doesn't mean a bigger transformer.

Factories & offices

Workplace and fleet charging within your sanctioned load, scheduled around your processes and the tariff.

Fuel stations

Approvals and safe clearances around fuel dispensers designed in from the first drawing.

Fleets & depots

e-3W, cab and delivery fleets. For e-bus depots: balance-of-plant, power quality, and operations and maintenance (O&M).

Charge point operators (CPOs)

A local installation and O&M partner in southern Tamil Nadu: you run the app, roaming and pricing, and we keep the hardware working.

Charger types

Which charger for which vehicle

Match the charger to the vehicle and to how long it stays.

Fig.: Charger types and the vehicles they suit. Schematic, not to scale.
Charger types with their device and connector standards, as listed in Annex I of the Ministry of Power's 2024 guidelines.
ChargerPowerBest forStandards (device / connector)
Light EV AC pointup to 7 kWScooters, e-autos and small cars parked for a whileDevice IS 17017-22-1Connector IS 60309 socket; vehicle inlet IS 17017-2-7 or 2-2
Light EV DC (Type 6)up to 12 kWScooters and e-autos needing a quick top-upDevice IS 17017-25Connector IS 17017-2-6
LECCS (Type 7), India's combined AC/DC connector for light EVsup to 7 kW AC / 12 kW DC2W and 3WDevice IS 17017-31Connector IS 17017-2-7 (BIS, 2023)
Type 2 AC7.4 / 11 / 22 kWCars parked for hours: homes, offices, hotelsDevice IS 17017-1Connector IS 17017-2-2
CCS2 DC50–250 kWCars on highways and at city fast-charging hubsDevice IS 17017-23Connector IS 17017-2-3
CCS2 DC high power250–500 kWBuses and trucksDevice IS 17017-23Connector IS 17017-2-3

Bharat AC-001, Bharat DC-001 and CHAdeMO are not in the 2024 standards annex. Many early sites still use them, and they're candidates for an upgrade. Charger audits, repair & upgrades

The car's on-board charger, not the wall box, often limits AC charging speed.

Source: Ministry of Power (copy hosted by WBSEDCL), Guidelines and Standards for Electric Vehicle Charging Infrastructure, 2024 (opens in a new tab) (17 September 2024).

Battery-buffered charging

Small connection, fast charger

Fig.: A battery between a small grid connection and a fast charger, over the EV tariff's time-of-day slots. Schematic, not to scale.

Cheapest 09:00–16:00 Dearest 06:00–09:00 · 18:00–22:00

  1. Fill steadily

    The grid, and solar if you have it, charges the battery within the connection you already have.

  2. Boost on demand

    When a vehicle plugs in, the charger draws from the grid and the battery together.

  3. Refill between sessions

    The battery recharges between sessions, ideally in cheaper hours or from solar.

Where it helps

  • Avoid or defer transformer and connection upgrades
  • Limit demand peaks
  • Keep charging through short outages
  • Use more of your own solar

Whether a buffer beats a bigger connection depends on how busy the chargers will be, your tariff category, fixed and demand charges, and upstream costs. EV charges can change with the next tariff order, so we model the current position and a bigger-connection option side by side.

The Ministry of Power's 2024 guidelines allow public charge point operators to complement stations with storage, and describe solar carports with battery storage as an alternative to grid-dependent charging. NFPA 855 (2026) covers EV charging with integrated storage.

In Tamil Nadu, the EV charging tariff (LT-VII / HT-V) is cheapest from 9 am to 4 pm and dearest from 6–9 am and 6–10 pm (TNERC Tariff Order No. 6 of 2025). A battery can store daytime energy for evening charging.

In forceRevision pending as of September 2026

Source: Ministry of Power (copy hosted by WBSEDCL), Guidelines and Standards for Electric Vehicle Charging Infrastructure, 2024 (opens in a new tab) (17 September 2024).

Source: Energy-Storage.news, National Fire Protection Association releases NFPA 855 ESS safety standard, 2026 edition (opens in a new tab) (18 September 2025).

Source: TNERC, Tariff Order No. 6 of 2025 (opens in a new tab) (30 June 2025, effective 1 July 2025).

Read the explainer

Process

Seven steps from site to session

Most charging delays come from the connection and the paperwork, not the charger. We start both on day one.

  1. Site survey

    Parking, cable routes, existing supply, space for a battery if needed.

    Deliverable: Survey notes & photos

  2. Load & tariff study

    Sanctioned load, tariff category (a separate EV service or within your premises), charger mix.

    Deliverable: Connection options

  3. Design

    Protection, earthing, surge protection, cabling, civil works, signage.

    Deliverable: SLD & layout

  4. DISCOM application

    Connection or load-change application with the required documents, plus any site-specific approvals.

    Deliverable: Application file

  5. Installation

    Foundations, cabling, terminations, charger mounting.

    Deliverable: Installation records

  6. Commissioning & OCPP onboarding

    Safety tests, Electrical Inspectorate clearance, connection to your charging software.

    Deliverable: Commissioning report

  7. O&M

    Monitoring, maintenance, repairs and compliance records.

    Deliverable: Monthly report

Rules at a glance

The rules in force today

As of
Fig.: EV tariff slots in Tamil Nadu (TNERC T.O. 6/2025; revision pending as of Sep 2026). Schematic, not to scale.

Cheapest 09:00–16:00 Dearest 06:00–09:00 · 18:00–22:00

Rules change. We check the current position for every project.

Read: setting up a charging station, rule by rule

O&M

A charger that doesn't work earns nothing

Out-of-order chargers are public charging's most visible weakness. Most of the fix is routine: remote monitoring, regular inspection and a stock of the parts that wear.

  • Remote

    Heartbeat alarms, stuck sessions, remote reset.

  • On site

    Connectors, cables, thermal scans, RCD and earth-continuity tests.

  • Records

    Inspection and test logs kept for at least 7 years.

We report availability, session success and time to repair every month. Targets, response times and exclusions are agreed site by site in each annual maintenance contract (AMC).

See the full charger O&M scope

Source: CEA, CEA (Measures relating to Safety and Electric Supply) Regulations, 2023, Chapter XI (opens in a new tab) (8 June 2023).

Fig.: Remote data over OCPP, a technician on site, a spare connector and cable. Schematic, not to scale.

Partners

A partner on the ground

National networks bring the app, roaming and payments. We bring local design, installation and maintenance in southern Tamil Nadu. If you run a network or make chargers and need an installation and O&M partner here, let's talk.

What a network or maker gets

  • Site surveys and connection applications in southern Tamil Nadu
  • Installation and commissioning to your specification, with OCPP onboarding to your platform
  • Preventive maintenance, first-line repairs and a local spares pool
  • CEA compliance records kept for the owner
Partner with us
Fig.: An installation and O&M partner on site. Illustrative. Schematic, not to scale.

Subsidies

What support exists, and who can claim it

In force · to 31 Mar 2028

₹2,000 crore of the ₹10,900 crore PM E-DRIVE scheme is for public charging, and the charging component runs to 31 March 2028. Proposals come from central ministries, central public-sector enterprises (CPSEs) and states or union territories through their nodal agencies, which may set up stations themselves or select charge point operators by transparent bidding. Support depends on the location:

  • Government premises with free public access: 100% of upstream infrastructure and 100% of chargers.
  • Public-sector sites such as railway stations, AAI airports, public-sector fuel outlets, state bus stations, metro stations, municipal parking and NHAI or state toll plazas: 80% of upstream and 70% of chargers.
  • Other locations, and battery swapping or charging stations: 80% of upstream.

For a private host, that usually means you can't apply directly. We follow tenders where we can take part as contractor or O&M partner. State incentives change, so we check what's open when we scope your project.

Source: Ministry of Heavy Industries, PM E-DRIVE operational guidelines for public charging stations (opens in a new tab) (26 September 2025).

Source: Autocar Professional, PM E-DRIVE scheme extended till FY28 end (opens in a new tab) (8 August 2025).

Questions about EV charging

No. It's a de-licensed activity under the Ministry of Power's 2024 guidelines. You follow the guidelines, get a DISCOM connection and obtain the Electrical Inspectorate's safety clearance.

Often, yes. In Tamil Nadu, charging within HT premises may be billed at the premises' own tariff, or you can take a separate EV service within the premises under the EV tariff. We'll work out which is better for you.

The guidelines set 3 days in metro areas, 7 in other municipal areas, 15 in rural areas and 30 in hilly rural areas, or 90 days where the network must be extended.

It depends on how long vehicles stay. Parked for hours (homes, offices, hotels): AC. Stopping for minutes (highways, taxis): DC. Scooters and e-autos: light-EV AC/DC or LECCS points.

The electricity cost, passed through, plus a service charge capped by the Ministry of Power until 31 March 2028, plus GST. The rate must be displayed at the station.

When the connection is small, demand peaks are costly, outages are common, or you want to use your own solar. A battery lets fast chargers run without sizing everything for the peak.

We can. The CEA's 2023 safety regulations make the owner responsible for having the maker's specified RCD and station tests carried out, and for keeping inspection and test records for at least 7 years. Our AMC covers both.

Yes. We connect chargers over OCPP to the charging management software you choose; roaming across apps runs through protocols such as OCPI and UEI via your network partner.

Yes. We start with a health check, then repair, replace worn connectors and cables, and plan upgrades for older Bharat-standard or non-OCPP units.

PM E-DRIVE supports chargers at sites proposed by government bodies, with operators chosen by bidding. State incentives change. We check what applies to your site when we scope it.

Yes, on the power side: site power design, fire-safe enclosures and O&M. The Ministry of Power issued guidelines for battery swapping and charging stations on 10 January 2025. We don't run a swapping brand.

A DC pillar needs a small plinth, safe clearances and a bay close enough that the vehicle sits within 5 m of the charging point; AC units can be wall-mounted. Basement and fuel-station sites need extra approvals, such as a fire NOC or PESO approval, which we check for each site.

Start with the connection

Planning chargers? Let's check your connection first.

Tell us the site, the vehicles and how long they stop. We'll tell you what the connection can carry, and whether a battery helps.